Upgrade Kit 12-15/16 Long Leads AAMI
Diagnostic ECG Patient Cables and Leads
  • Single product shot
  • Standard product photograph

Upgrade Kit 12-15/16 Long Leads AAMI

Diagnostic ECG Patient Cables and Leads
Long Upgrade Kit shielded 12-15/16 leads AAMI color coded for PageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m0)), 6 shorting plugs, lead separators, 6 colored clips, 6 colored rings, 4 brown base rings and instructions for use. The additional lead sets come pre-assembled with the brown base rings. 1 kit = 1 sales unit.

Specifications
  • ECG Diagnostic ECG Patient Cables and Leads
    Patient Application
    Child; Adult
    Application Site
    Limb; Chest
    Number of Leads
    16
    Shielded
    Shielded
    Electrode Attachment Method
    Alligator Clip
    Color Coding
    AAMI
  • Product details
    Use with Non-Philips Healthcare Equipment
    No
    Use with Philips Healthcare Equipment
    860315, 860310
    Product Category
    ECG
    Product Type
    Diagnostic ECG Patient Cables and Leads
    CE Certified
    No
    Single-Patient Use OR Multi-Patient Use
    Multi-Patient Use
    Packaging Unit
    1
    Not manufactured with natural rubber latex
    Yes
    Minimum Shelf Life
    None
    Sterile OR Non-Sterile
    Non-Sterile
    Use with Other Supplies
    N/A

Documentation

Diagnostic cardiology supplies catalog
PDF|2.35 MB
Enhancing ECG quality application note
PDF|312.73 KB

Related products

  • PageWriter Cardiograph
    The Philips PageWriter TC50 cardiograph is an advanced, reliable, and compact ECG solution, that is easy to use. The TC50 will help you meet your daily demands, giving you time to focus on your patients.
  • PageWriter Cardiograph
    Philips PageWriter TC70 cardiograph is designed to simplify diagnostic ECG testing and streamline workflow – where an automated workflow and outstanding clinical support is critical.
Disclaimer
Product may not be available in all geographies, please check with your Philips representative for complete portfolio availability.